Building a Home…Expect Change Orders
TEARDOWN DIARY
You Can Fight Back Against Change Orders – But You Can’t Escape
August 27, 2008 10:21 a.m.
Change orders are endemic in custom home building. As I recently learned, you can try to fight them — but they will happen anyway.
Technically, a change order is the written authorization to the contractor to make a change or addition to the work described in the original contract. It modifies the plans and specifications, and usually results in a new price for the project – either lower or higher, depending on the change. For example, if a homeowner decides halfway through the process that the family room ceiling should be vaulted or the master bathtub is too small, the contractor calculates the additional cost or cost savings, taking into account all the back work involved (plumbing, electrical work), the impact on other decisions (insulation, gas capacity) and presents the client with a summary of the difference. For the work to get done, the client has to sign the change order.
From Day One of my new home project I was wary of change orders. They are demonized in many housing “How To” books as significantly increasing the cost of a project. That’s because changes usually mean additions – and typically more additions means more revenue for the contractors. Some builders even charge a fee to process changes, upping the total more.
Early in the design process I announced to my architect and contractor that I wanted to make the plans so air-tight we would not need any changes whatsoever. I would choose every last fixture and make every material choice ahead of time. The architect and contractor both rolled their eyes. With a little humor and a touch of condensation, they explained that change orders are impossible to avoid with custom homes like mine: Even with the best drawings, things look different when you see the tangible rendition.
Other contractors concurred. “That question makes it clear you have never built a house before,” said Jay Grant, president of Grant Homes, a residential design/build firm in Mendham, N.J. Architects aren’t perfect – even the best have some mistakes in their drawings — and those mistakes (whether they be making a door too high for the ceiling beams or miscalculating the need for additional windows) aren’t always apparent until construction begins.
The only way to avoid change orders is if the clients physically remove themselves from the process, said Mr. Grant, returning only when the house is all built. “From ground to completion there’s a decision every day,” he said. “It is human nature to walk through a house and see little things that could be done better.”
It certainly is my husband Dave’s human nature, it turns out. When we started the house, Dave made it clear that it was my project: He was busy at work and I would have to take control of all the details. We have very similar taste, so he trusted my decisions. Dave kept an eye on the cost of the project and played the lead role in negotiating the loan. I handled all the meetings with the architect and contractors.
Then, suddenly, as soon as construction started, Dave became a player. He was at the site very day, walking through and checking to make sure everything was going as specified. He chided me for not going there as often and emailed photos to our relatives and friends. For the most part, this was a welcome development; it is our house and I wanted him to feel like he’d built it too. And the more involved he became the less likely he could blame me for any problems that might arise. But it also meant that since he didn’t pick all the details, he had new ideas for the house – ones that meant plenty of change orders.
Walking up the back stairway, Dave decided the house would be much nicer with two additional windows along the side wall. Kaching! A $2,732 change. But that meant we could get rid of another window, deducting $664, for a total add of $1,550. Dave read about on-demand, or tankless and instantaneous, water heaters — a process that uses less energy because it provides hot water only as needed, rather than maintaining a constant reserve. That sounded like a good idea, he decided: Another $4,234 extra.
I successfully blocked two of Dave’s suggested changes: Switching three of the windows to casements from double hung (the windows had already arrived and it would have meant eating the extra cost); and adding air conditioning, a request Dave made after Portland was hit with a week of 100-plus temperatures, which would have added another $5,500 to the final bill.
A few of the changes weren’t our fault – and they are the kind that infuriate homebuilders using a cost-plus contract model with their contractor (one that can change along with the scope of the job and the cost of the materials rather than a fixed contract). The contractor underestimated the gas pressure that would be required, adding $1,258 to our bill. And though tests for asbestos were included in our final contract, the contractor didn’t think we would need asbestos abatement. We did, to the tune of $1,604. Though it makes me mad, there’s nothing I can do about it. That’s why, typically, trust between the builder and the client can start to erode if there are many of these kinds of changes.
To be fair to my contractor and Dave, I’ve also been guilty of changing my mind. Somehow in the design process I allowed the stairway to be designed boxed in with a wall. After looking at the space it became clear that wouldn’t look great – and that wider steps would look better. That added $3,041 to our bill. But the biggest change order actually resulted in significant savings – and it was mine. By switching the roofing material from a product called TruSlate to asphalt, we saved $38,092.
Matt Breyer, head of Breyer Construction and Landscape in Reading, Pa., agrees that change orders are unavoidable. But he warns that unscrupulous contractors may intentionally quote projects leaving out as much as possible, with the intent to be the cheapest (and therefore win the bid), then use the change order to charge exorbitant amounts for things not covered.That can be unfair for the client.
At this point, with the framing and plumbing finished and the windows about to go in, we are about $14,000 below our contract total because of change orders. This will also reduce the commission we pay our contractor, which is a percentage of the overall price of the contract.
We could have avoided the changes if we were willing to get a house that was not exactly what we wanted. But by nature, anyone doing a remodel or a custom home is in it to get exactly what they want. Hence I have reluctantly concluded that change orders are indeed inevitable – but I’ve vowed that we won’t have any more.



